Selling a house without building regulations approval

Selling a house without building regulations approval

Selling a house without building regulations approval

A plain-English guide. General information, not legal advice.

A plain-English guide. General information, not legal advice.

Brick house extension under construction with scaffolding and new roof timbers

Selling a house without building regulations approval is possible, but you must tell the buyer, and it can slow the sale down. The usual fixes are to get retrospective approval from the council (a regularisation certificate) or to buy an indemnity insurance policy. If neither works for you, you can sell the house as it is, through an agent, at auction or to a cash buyer.

Planning permission and building regulations are not the same

People often mix these up, but they are two separate things. The Planning Portal explains:

Planning permission is about how a place develops: what a building is used for, how it looks, and its effect on neighbours and the area.

Building regulations set standards for how the work is designed and built. They cover safety and health, energy use, and access.

Many projects, like an extension, need both. Some only need one. Knocking down an internal wall, for example, may need building regulations approval but not planning permission. Some extensions don’t need a planning application at all, but they still need building regulations sign-off. So “we didn’t need planning” doesn’t mean the work was signed off.

What paperwork a buyer’s solicitor will ask for

When building work is approved, you get a certificate at the end. The buyer’s solicitor will want to see it. The main ones are:

A completion certificate from the council’s building control team or a private building control body. This covers things like extensions, loft conversions, garage conversions and removed walls.

A competent person scheme certificate. GOV.UK explains that registered installers can certify their own work, and should give you a certificate within 8 weeks. Examples are FENSA for replacement windows and doors, the Gas Safe Register for a new boiler, and a registered electrician for electrical work.

FENSA says buyers’ solicitors will want proof that replacement windows and glazed doors fitted since April 2002 meet building regulations. Missing paperwork doesn’t always mean the work wasn’t approved. You can often get a copy. FENSA and Gas Safe Register both let you order a replacement certificate online, and the council may hold copies of old completion certificates. Check this first.

Regularisation certificate: retrospective approval

If work was done without approval, you can apply to your council for a regularisation certificate. This is retrospective approval. Some things to know:

It only covers work started on or after 11 November 1985. Older work can’t be regularised.

You apply to the council’s building control team. Private building control bodies can’t do this.

The council checks the work against the rules that applied when it was done.

The Planning Portal says you may need to expose, remove or fix parts of the work. That can mean opening up parts of a floor, wall or ceiling so the work can be checked.

The fee is set by each council and depends on how much work was done.

If the council asks for repairs and they aren’t done, you won’t get a certificate.

Regularisation is the most complete fix, because it settles the question for future buyers too. But it takes time, it costs money, and once you’ve asked, the council knows about the work.

Indemnity insurance for missing building regulations

An indemnity policy is a one-off payment, usually arranged through your solicitor. It covers the buyer’s financial loss if the council takes enforcement action over the work. The HomeOwners Alliance says policies often cost between about £20 and £300, depending on the house price.

It has limits:

It doesn’t prove the work is safe or well built, and it doesn’t pay to put poor work right.

The HomeOwners Alliance warns that a policy can become invalid if anyone contacts the council about the missing approval. Talk to your solicitor before you, your agent or a buyer calls building control.

Some buyers and lenders won’t accept a policy.

How long can the council take action?

The rules changed recently, and this is why some older advice is now wrong.

Building regulations. The Building Act 1984 lets the council serve a notice telling the owner to remove or alter work that breaks the rules. Since 1 October 2023, after changes made by the Building Safety Act 2022, the time limit for this notice is 10 years from when the work was finished. Before that, it was 12 months. The change isn’t retrospective, so older work may be treated differently. The council can also ask a court for an injunction, which has no fixed time limit. Ask your solicitor how this applies to your work.

Planning. GOV.UK guidance says that, in England, building work substantially completed on or after 25 April 2024 can face planning enforcement for 10 years. The old 4-year rule still applies to building work that was substantially completed before that date.

You must declare it on the TA6 form

The Law Society’s TA6 Property Information Form (6th edition) asks about this directly. Question 5.1 lists alterations including replacement windows and glazed doors since 1 April 2002, extensions, conservatories, loft conversions, garage conversions and removed internal walls or chimney breasts. Question 5.2 asks for details, dates and paperwork. Questions 5.4 and 5.5 ask about any planning or building control breaches or issues. Electrical work goes in section 11.

The form warns that buyers can rely on your answers, and if you give misleading information, the buyer may be able to claim compensation after completion. If you don’t know whether work was approved, say so. Your solicitor can help.

Selling a house without building regulations: your options

Regularise first. Best if you have time and think the work is sound. You’ll have a clean set of papers, and an estate agent may get you the most money.

Use an indemnity policy. Often the quickest fix for smaller or older work, if the buyer and their lender accept it. Don’t contact the council until you’ve spoken to your solicitor.

Sell as it is through an agent or at auction. Tell buyers up front and price it to reflect the risk. A buyer’s surveyor may still flag it, which can lead to a lower offer. Our guide on what to do if your house is down-valued or fails a survey covers that. At auction, buyers often pay cash or use bridging finance, contracts usually exchange when the hammer falls at a traditional auction, and there are fees.

Sell to a cash buyer. MyHouseOffer introduces people selling a house in the North West, the West Midlands and Sheffield to independent cash buyers in our network. We’re not the buyer. They’re property investors who pay cash or use short-term bridging finance, so you don’t wait on a buyer’s mortgage. Their survey or lender may still check the house, and the offer can change if something new is found. The trade-off is price: a cash offer is below full market value, typically around 70% to 80%, and it will reflect the cost and risk of the unsigned work. In return, you get speed, no viewings, no chain and no agent fees, and you pay MyHouseOffer nothing. You choose your own solicitor, and you’re free to say no to any offer, with no pressure. If the house needs other repairs too, see selling a house that needs work.

If the work is sound and you have time, regularising and selling through an agent will usually leave you with more. It’s sensible to get an agent’s view and a cash estimate, then compare. When you’re ready, get your free estimate.

This is general information, not legal advice. Speak to a solicitor about your own sale.

Common questions

Can you sell a house without building regulations approval?

Yes. You must declare the work on the TA6 form, and the buyer’s solicitor will ask how it’s being dealt with. The usual routes are a regularisation certificate from the council, an indemnity insurance policy, or selling the house as it is at a price that reflects the risk.

What is a regularisation certificate?

It’s retrospective building regulations approval from your council for work done without approval and started on or after 11 November 1985. The council inspects the work against the rules in force at the time, and you may need to open up parts of it or make repairs. Fees are set by each council and depend on the work.

Does indemnity insurance cover missing building regulations?

It covers financial loss if the council takes enforcement action, but it doesn’t prove the work is safe and doesn’t pay to fix it. A policy can become invalid if anyone contacts the council about the work, so speak to your solicitor first. Some buyers and lenders won’t accept one.

How long can the council take action over building regulations?

Since 1 October 2023, the limit for a council notice to remove or alter work that breaks building regulations is 10 years after the work was finished. Before that, it was 12 months, and the change isn’t retrospective, so ask a solicitor about older work. Planning enforcement in England is also 10 years for work completed on or after 25 April 2024.

What’s the difference between planning permission and building regulations?

Planning permission is about what you build and how it affects the area, such as its use and appearance. Building regulations are about how it’s built, covering safety, health and energy use. Many projects need both, and some need only building regulations approval.

Will a cash buyer buy a house without building regulations?

Many cash buyers will consider it, because they don’t rely on a standard residential mortgage. The offer will be below full market value and will reflect the cost and risk of the unapproved work. Their survey or lender may still check the house, and the offer can change if something new is found.

Can you sell a house without a completion certificate?

Yes. The buyer’s solicitor will ask for the building regulations completion certificate for any work that needed one. If you can’t find it, ask the council’s building control team for a copy. If it was never issued, the usual options are a regularisation certificate or, in some cases, indemnity insurance.

Related guides: Selling a house that needs work · Selling a house with spray foam insulation · Selling a house with subsidence

Find out what a cash buyer would pay for your house

Find out what a cash buyer would pay for your house

Free, no obligation, and it takes about a minute.